Artefact ID: OI-BOK-PROP-001
Version: 0.2
Status: Regenerated proposition and evidence register; pending final release proof
Source chapters: OI-BOK-001 through OI-BOK-009 v0.3
Terminology baseline: OI-BOK-GLO-001 — Consolidated Project OI Glossary v0.2
Roadmap authority: OI-BOK-SYN-001 — Chapters 1–5 Synthesis and Remaining-Chapter Roadmap
Register scope: 182 chapter propositions
Validation status: None of the propositions is independently validated as a Project OI law or causal theory
Date: 15 August 2026


1. Purpose

This register consolidates every working proposition from the nine completed Project OI domain chapters into one traceable evidence and disposition system.

It is intended to:

  • assign a stable global identifier to every proposition;
  • preserve the exact chapter wording and source location;
  • map each proposition to the OI capability model and preferred glossary terms;
  • distinguish direct literature anchors, source-grounded synthesis, emerging AI-era evidence and Project OI integrative extensions;
  • make confidence, evidence limits and required validation visible;
  • identify duplicate, overlapping and transition propositions for the first BOK release;
  • and prevent Chapter 10 from presenting 182 locally useful propositions as 182 independent validated constructs.

The register does not validate the propositions. A direct literature anchor means that the proposition closely reflects a cited source or established research line; it does not mean that the proposition’s complete Project OI wording or cross-domain generalisation has been tested independently.


2. Inventory Summary

Chapter Capability position Propositions
OI-BOK-001 — Signals and Attention Sense 10
OI-BOK-002 — Organisational Context Contextualise 14
OI-BOK-003 — Knowledge and Expertise Know 16
OI-BOK-004 — Decision and Authority Choose 20
OI-BOK-005 — Coordination and Collective Action Mobilise — coordination 20
OI-BOK-006 — Execution and Operational Reliability Mobilise — execution 25
OI-BOK-007 — Outcomes, Feedback and Evaluation Outcome–feedback bridge 25
OI-BOK-008 — Organisational Memory, Reflection and Learning Learn 25
OI-BOK-009 — Capability Development and Adaptation Adapt 27
Total 182

2.1 Evidence-Basis Distribution

Code Meaning Count Interpretation
D Direct literature anchor 79 The proposition closely follows one or more cited research findings or established distinctions.
S Source-grounded synthesis 50 The proposition combines sources or extends a source-backed mechanism across the chapter.
A Emerging AI-era evidence 26 The proposition relies materially on recent and setting-specific AI or automation evidence.
O Project OI integrative extension 27 The proposition primarily links chapters, introduces a Project OI working distinction or closes part of the OI cycle.

2.2 Confidence Distribution

Confidence Count Meaning
High 79 Strong source anchor; still requires construct and transfer validation.
Moderate 50 Supported synthesis; wording, scope and level of analysis require consolidation.
Moderate–Low 53 Emerging or integrative claim requiring explicit empirical and adversarial testing.

2.3 Disposition Distribution

Code Disposition Count
RAD Retain pending final adversarial and construct-boundary review 78
RCC Retain pending cross-chapter consolidation and wording review 48
RAI Retain with explicit AI task, model, setting and time qualification 26
ROI Retain as a Project OI working proposition requiring validation 18
C10 Consolidate into Chapter 10 Connection Quality and loop closure 9
SCP Retain with explicit scope qualifier 2
MRG Merge in the final proposition set while preserving source provenance 1

Cross-chapter clustering: 25 consolidation clusters contain 145 proposition memberships across 118 unique propositions. Cluster membership indicates overlap or dependency, not that the member propositions are identical.


3. Stable ID Scheme

Stable proposition IDs use:

OI-PROP-[DOMAIN CODE]-[SEQUENCE]
Code Owning chapter Capability position
SEN OI-BOK-001 — Signals and Attention Sense
CTX OI-BOK-002 — Organisational Context Contextualise
KNW OI-BOK-003 — Knowledge and Expertise Know
DEC OI-BOK-004 — Decision and Authority Choose
COO OI-BOK-005 — Coordination and Collective Action Mobilise — coordination
EXE OI-BOK-006 — Execution and Operational Reliability Mobilise — execution
EVL OI-BOK-007 — Outcomes, Feedback and Evaluation Outcome–feedback bridge
LRN OI-BOK-008 — Organisational Memory, Reflection and Learning Learn
ADP OI-BOK-009 — Capability Development and Adaptation Adapt

The stable ID does not imply that the proposition will survive unchanged into the final Chapter 10 proposition set. It preserves traceability even where propositions are merged, scoped, challenged or rejected later.


4. Evidence and Confidence Model

4.1 Direct Literature Anchor — D

Use where the proposition closely reflects a source finding, established distinction or mature research line cited in the owning chapter. “Direct” describes the route from source to proposition, not validation of the complete Project OI construct.

4.2 Source-Grounded Synthesis — S

Use where the proposition combines several sources, applies a source mechanism to the organisational level or creates a chapter-level implication that is not stated verbatim in one source.

4.3 Emerging AI-Era Evidence — A

Use where the proposition depends materially on recent evidence about AI, Agents, automation or human–AI work. These propositions require explicit qualification by task, model, organisation, interface, study design and date.

4.4 Project OI Integrative Extension — O

Use where the proposition primarily connects capabilities, formalises a transition, introduces a Project OI working construct or makes a normative design claim not yet established as an empirical generalisation.

4.5 Confidence

Confidence reflects the present evidence basis of the proposition, not confidence that the proposition is universally true. All propositions remain subject to construct-validity, cross-chapter and field review.


5. Validation Codes

Code Required review
V1 Construct boundary and terminology review
V2 Cross-chapter consistency and transition review
V3 Unit and level-of-analysis review
V4 Temporal, mechanism and causal-validity review
V5 AI, technology and version-specific external-validity review
V6 Operationalisation and measurement feasibility
V7 Governance, ethics, power and responsible-use review
V8 Field and SMB empirical validation

V8 is attached to every proposition because the BOK remains a literature-grounded working synthesis and has not yet been tested through the planned field and SMB research programme.


6. Evidence Anchor Catalogue

Evidence anchors are chapter-level source groupings used to avoid repeating full bibliographic references in every proposition row. The complete and authoritative citations remain in the owning BOK chapters.

6.1 Signals and Attention

Anchor Evidence theme Source basis
SEN-E1 Attention structures and selective allocation Ocasio (1997); Joseph et al. (2024).
SEN-E2 Information scarcity, overload and attention demand Simon (1971); Edmunds & Morris (2000); Shahrzadi et al. (2024); Bernstein et al. (2024).
SEN-E3 Interpretation systems and sensemaking Daft & Weick (1984); Weick, Sutcliffe & Obstfeld (2005).
SEN-E4 Weak signals and graduated attention Ansoff (1975); weak-signal literature reviewed in OI-BOK-001.
SEN-E5 High reliability, anomaly attention and collective mindfulness Roberts (1990); Weick, Sutcliffe & Obstfeld (1999).
SEN-E6 Voice, issue selling and dissent Issue-selling, employee-voice and attention literature reviewed in OI-BOK-001.
SEN-E7 Knowledge and expertise routing Argote (2024) and the knowledge-routing literature later consolidated in OI-BOK-003.
SEN-E8 AI and automated attention effects Emerging AI and automation synthesis in OI-BOK-001; evidence remains limited and time-sensitive.
SEN-E9 Project OI attention-to-orientation integration Cross-chapter synthesis in OI-BOK-001; direct empirical validation not yet undertaken.

6.2 Organisational Context

Anchor Evidence theme Source basis
CTX-E1 Context as situational meaning and constraint Johns (2006); Dey (2001).
CTX-E2 Sensemaking and the knowing organisation Weick, Sutcliffe & Obstfeld (2005); Choo (1996).
CTX-E3 Situated, distributed and partly tacit context Suchman (1987/2007); Hutchins (1995); Nonaka & Konno (1998).
CTX-E4 Boundary objects and cross-boundary translation Star & Griesemer (1989); Carlile (2002, 2004).
CTX-E5 Long context, retrieval and context engineering Liu et al. (2024); Anthropic engineering guidance cited in OI-BOK-002.
CTX-E6 Purpose, provenance, time, permissions and contestability Project OI synthesis across the organisational-context literature in OI-BOK-002.
CTX-E7 Human–AI context risks OI-BOK-002 synthesis of source authority, permission, memory and model-context risks; time-sensitive.
CTX-E8 Context-to-feedback integration Project OI cross-chapter extension connecting context use, correction and future assembly.

6.3 Knowledge and Expertise

Anchor Evidence theme Source basis
KNW-E1 Expertise coordination and transactive memory Faraj & Sproull (2000); Ren & Argote (2011).
KNW-E2 Knowing in practice, communities and tacit knowledge Orlikowski (2002); Brown & Duguid (1991); Nonaka (1994); Nonaka & von Krogh (2009).
KNW-E3 Expertise, experience and domain specificity Rousseau & Stouten (2025).
KNW-E4 Relational access and actionable knowledge Cross & Sproull (2004); Borgatti & Cross (2003).
KNW-E5 Knowledge integration, transfer and distributed knowledge Grant (1996); Kogut & Zander (1992); Argote & Ingram (2000); Argote, McEvily & Reagans (2003).
KNW-E6 AI distribution of expertise and learning effects Brynjolfsson, Li & Raymond (2025); Dell’Acqua et al. (2026); Vaccaro et al. (2024); Sundaresan & Guler (2025).
KNW-E7 Knowledge authority, contestability and decision connection Project OI synthesis connecting expertise research to authority and evaluation.
KNW-E8 Expertise use, retention and future capability Project OI cross-chapter extension into learning and capability development.

6.4 Decision and Authority

Anchor Evidence theme Source basis
DEC-E1 Bounded rationality, decision framing and process Simon (1955); Mintzberg, Raisinghani & Théorêt (1976); Nutt (1993).
DEC-E2 Decision rights, formal authority and real authority Jensen & Meckling (1995); Aghion & Tirole (1997).
DEC-E3 Decision-process effectiveness and speed Dean & Sharfman (1996); Eisenhardt (1989).
DEC-E4 Hidden information and information sharing Stasser & Titus (1985); Mesmer-Magnus & DeChurch (2009).
DEC-E5 Dissent, cognitive conflict and decision quality Amason (1996); Schweiger, Sandberg & Ragan (1986); Dooley & Fryxell (1999).
DEC-E6 Voice and psychological safety Morrison (2023); Edmondson (1999).
DEC-E7 Legitimacy, accountability and procedural judgement Tyler (2006); Bovens (2007); Lerner & Tetlock (1999); Siegel-Jacobs & Yates (1996).
DEC-E8 Escalation of commitment and outcome bias Staw (1981); Baron & Hershey (1988).
DEC-E9 Algorithm reliance, oversight and AI governance Dietvorst, Simmons & Massey (2015); Logg, Minson & Moore (2019); Buçinca, Malaya & Gajos (2021); NIST AI RMF.
DEC-E10 Project OI decision-and-authority integration Project OI synthesis connecting recommendation, authority, commitment, action and review.

6.5 Coordination and Collective Action

Anchor Evidence theme Source basis
COO-E1 Dependency management and process design Malone & Crowston (1994); Crowston (1997).
COO-E2 Interdependence and coordination modes Thompson (1967); Van de Ven, Delbecq & Koenig (1976); Adler (1995).
COO-E3 Integrative conditions for coordination Okhuysen & Bechky (2009).
COO-E4 Relational coordination Gittell (2001, 2002); Gittell, Seidner & Wimbush (2010).
COO-E5 Fast-response and dialogic coordination Faraj & Xiao (2006); Bechky & Okhuysen (2011).
COO-E6 Collective mind and role-based coordination Weick & Roberts (1993); Bechky (2006).
COO-E7 Implicit coordination, shared mental models and distributed teams Rico et al. (2008); Mathieu et al. (2000); Hinds & Bailey (2003); Olson & Olson (2000).
COO-E8 Knowledge boundaries and translation Carlile (2002, 2004); Postrel (2002).
COO-E9 Human–AI teamwork and task fit Dell’Acqua et al. (2026); Vaccaro et al. (2024).
COO-E10 Project OI mobilisation and loop integration Project OI synthesis connecting commitment, dependency, action, outcome and learning.

6.6 Execution and Operational Reliability

Anchor Evidence theme Source basis
EXE-E1 Organisational control, enabling formalisation and routine dynamics Ouchi (1979); Adler & Borys (1996); Feldman & Pentland (2003).
EXE-E2 Dependability, faults, errors and failures Avizienis et al. (2004).
EXE-E3 High-reliability organisations and collective mindfulness Roberts (1990); Weick, Sutcliffe & Obstfeld (1999).
EXE-E4 Complexity, safety and sociotechnical control Perrow (1984/1999); Rasmussen (1997); Leveson (2004).
EXE-E5 Human error and error-management culture Reason (2000); van Dyck et al. (2005).
EXE-E6 Robustness, resilience and graceful extensibility Woods (2015); resilience-engineering sources cited in OI-BOK-006.
EXE-E7 Frontline workarounds and hidden operational failure Tucker (2004); Tucker & Edmondson (2003).
EXE-E8 Human factors, situation awareness and automation Bainbridge (1983); Endsley (1995); Parasuraman, Sheridan & Wickens (2000); Lee & See (2004).
EXE-E9 Recovery, compensation and resilience testing Garcia-Molina & Salem (1987); Basiri et al. (2016); Zhang et al. (2021); Google SRE (2016).
EXE-E10 AI-Agent identity, security and long-running execution NIST AI-Agent resources (2026); Anthropic engineering evidence (2026).
EXE-E11 Project OI execution-to-evaluation integration Project OI synthesis connecting operational intent, completion integrity, evidence and outcome evaluation.

6.7 Outcomes, Feedback and Evaluation

Anchor Evidence theme Source basis
EVL-E1 Consequences, stakeholder outcomes and evaluation criteria Merton (1936); OECD (2019, 2021).
EVL-E2 Counterfactual reasoning and causal inference Holland (1986); experimental and quasi-experimental sources cited in OI-BOK-007.
EVL-E3 Theory-based evaluation and contribution analysis Weiss (1997); Mayne (2001); McLaughlin & Jordan (1999).
EVL-E4 Implementation fidelity and implementation outcomes Carroll et al. (2007); Proctor et al. (2011).
EVL-E5 Metric reactivity, target corruption and audit effects Campbell (1979); Goodhart (1975); Strathern (1997); Espeland & Sauder (2007).
EVL-E6 Feedback delays and dynamic complexity Sterman (1994); performance-feedback sources cited in OI-BOK-007.
EVL-E7 Measurement purpose and performance complexity Behn (2003); March & Sutton (1997); Meyer & Gupta (1994).
EVL-E8 Evaluation independence, use and context Patton & Campbell-Patton (2021); programme-evaluation sources cited in OI-BOK-007.
EVL-E9 Sociotechnical AI evaluation NIST AI RMF (2023/2024); NIST ARIA (2024 onward).
EVL-E10 Project OI feedback-to-learning bridge Project OI synthesis connecting execution evidence, evaluative judgement and learning readiness.

6.8 Organisational Memory, Reflection and Learning

Anchor Evidence theme Source basis
LRN-E1 Organisational memory and distributed retention Walsh & Ungson (1991); Levitt & March (1988); Huber (1991).
LRN-E2 Reconstructive and decision-time memory Memory and hindsight literature synthesised in OI-BOK-008.
LRN-E3 Single-loop, double-loop and defensive learning Argyris & Schön; defensive-routine literature cited in OI-BOK-008.
LRN-E4 Multilevel learning and institutionalisation Crossan, Lane & White (1999).
LRN-E5 Debriefing, lessons systems and psychological safety Tannenbaum & Cerasoli (2013); NASA lessons-learned material; Edmondson (1999).
LRN-E6 Learning from success, failure and near miss Success, failure and near-miss research reviewed in OI-BOK-008.
LRN-E7 Forgetting, unlearning and memory inertia Forgetting and unlearning literature reviewed in OI-BOK-008.
LRN-E8 Vicarious learning and transfer Vicarious-learning and knowledge-transfer sources cited in OI-BOK-008.
LRN-E9 AI memory, long-horizon evaluation and memory security LoCoMo (2024); LongMemEval (2025); AgentPoison (2024).
LRN-E10 Project OI learning-persistence and capability handoff Project OI synthesis connecting feedback, memory, use and capability development.

6.9 Capability Development and Adaptation

Anchor Evidence theme Source basis
ADP-E1 Evolutionary routines and capability formation Nelson & Winter (1982).
ADP-E2 Dynamic and operational capabilities Teece, Pisano & Shuen (1997); Eisenhardt & Martin (2000); Winter (2003); Teece (2007).
ADP-E3 Deliberate learning, institutionalisation and microfoundations Zollo & Winter (2002); Crossan, Lane & White (1999); Felin et al. (2012).
ADP-E4 Capability lifecycle Helfat & Peteraf (2003); Helfat et al. (2007).
ADP-E5 Absorptive capacity Cohen & Levinthal (1990); Zahra & George (2002); related sources cited in OI-BOK-009.
ADP-E6 Exploration, exploitation and ambidexterity March (1991); Levinthal & March (1993); Benner & Tushman (2003); O’Reilly & Tushman (2013).
ADP-E7 Replication and resource orchestration Winter & Szulanski (2001); Rivkin (2001); Sirmon et al. (2011).
ADP-E8 Path dependence, rigidities and capability traps Sydow, Schreyögg & Koch (2009); Repenning & Sterman (2002); Leonard-Barton (1992); Tripsas & Gavetti (2000).
ADP-E9 Resilience and adaptation Woods (2015); dynamic-capability and adaptability sources cited in OI-BOK-009.
ADP-E10 AI-enabled, borrowed and eroding capability Brynjolfsson, Li & Raymond (2025); Sundaresan & Guler (2025); Dell’Acqua et al. (2026); Demirer et al. (2026).
ADP-E11 Project OI capability-boundary and loop-closure extensions Project OI synthesis on capability claims, borrowed capability, sovereignty, coherence and loop closure.

7. Cross-Chapter Consolidation Clusters

These clusters identify repeated mechanisms, staged distinctions and propositions that should be reconciled before or within OI-BOK-010. They are not automatic merge instructions.

Cluster Theme Members Treatment
CL-01 Transition integrity and loop closure OI-PROP-SEN-010, OI-PROP-CTX-012, OI-PROP-KNW-016, OI-PROP-DEC-020, OI-PROP-COO-020, OI-PROP-EXE-025, OI-PROP-EVL-025, OI-PROP-LRN-025, OI-PROP-ADP-027 Retain chapter-local boundary statements; consolidate one higher-order Chapter 10 proposition on Connection Quality and loop closure.
CL-02 Feedback is not learning OI-PROP-EVL-003, OI-PROP-LRN-007 Merge the final proposition under Learning; preserve Chapter 7 as the bridge source.
CL-03 Transfer requires recontextualisation OI-PROP-KNW-007, OI-PROP-LRN-021, OI-PROP-ADP-010 Retain scoped forms for knowledge transfer, vicarious learning and capability transfer.
CL-04 Presence or retention is not availability or capability OI-PROP-KNW-001, OI-PROP-LRN-004, OI-PROP-LRN-024, OI-PROP-ADP-001 Retain the staged distinctions; integrate as an availability-to-capability chain in Chapter 10.
CL-05 Knowledge, decision and action authority OI-PROP-CTX-009, OI-PROP-KNW-008, OI-PROP-DEC-004, OI-PROP-DEC-017, OI-PROP-EXE-022 Preserve three authority types and reject AI capability as implied authority.
CL-06 Dissent, contestability and consensus OI-PROP-SEN-005, OI-PROP-CTX-010, OI-PROP-CTX-013, OI-PROP-KNW-015, OI-PROP-DEC-009, OI-PROP-DEC-008 Retain domain-specific propositions; reconcile around evidence-bearing challenge and legitimate disagreement.
CL-07 Quantity and retrieval are not quality or understanding OI-PROP-SEN-002, OI-PROP-CTX-002, OI-PROP-KNW-011, OI-PROP-EVL-011, OI-PROP-LRN-001 Use as one anti-substitution family rather than a single merged proposition.
CL-08 Purpose-bound relevance and scope OI-PROP-SEN-009, OI-PROP-CTX-003, OI-PROP-LRN-005, OI-PROP-EVL-002, OI-PROP-ADP-004 Retain across stages; Chapter 10 should show purpose as cross-cutting rather than a one-time input.
CL-09 Temporal and decision-time integrity OI-PROP-CTX-005, OI-PROP-DEC-014, OI-PROP-DEC-019, OI-PROP-EVL-023, OI-PROP-LRN-006 Consolidate the historical-integrity principle while retaining domain-specific requirements.
CL-10 Provenance, evidence and traceability OI-PROP-CTX-006, OI-PROP-DEC-002, OI-PROP-EXE-025, OI-PROP-EVL-011, OI-PROP-LRN-023 Retain as a cross-cutting epistemic and accountability condition.
CL-11 Handoff and boundary integrity OI-PROP-CTX-008, OI-PROP-COO-011, OI-PROP-COO-009, OI-PROP-EXE-008, OI-PROP-LRN-021 Chapter 5 owns generic Handoff; other propositions specify content and boundary risks.
CL-12 Concentration, distribution and fragility OI-PROP-KNW-010, OI-PROP-ADP-024, OI-PROP-ADP-026, OI-PROP-ADP-009 Retain; distinguish human, provider and ecosystem concentration.
CL-13 Human–AI task and system fit OI-PROP-KNW-014, OI-PROP-KNW-013, OI-PROP-KNW-012, OI-PROP-COO-018, OI-PROP-COO-017, OI-PROP-EXE-020, OI-PROP-EVL-020, OI-PROP-ADP-023, OI-PROP-ADP-025 Retain with task, model, setting and time qualification; integrate into Chapter 10.
CL-14 AI authority, identity and bounded execution OI-PROP-CTX-011, OI-PROP-DEC-019, OI-PROP-DEC-018, OI-PROP-DEC-017, OI-PROP-EXE-021, OI-PROP-EXE-022, OI-PROP-EXE-023, OI-PROP-LRN-023, OI-PROP-LRN-022, OI-PROP-ADP-024, OI-PROP-ADP-026 Retain; Chapter 10 should define the responsible human–AI authority boundary.
CL-15 Process, implementation, execution and outcome distinctions OI-PROP-DEC-014, OI-PROP-EXE-001, OI-PROP-EVL-017, OI-PROP-EVL-005, OI-PROP-EVL-001, OI-PROP-ADP-003 Retain the staged distinctions; avoid merging into a generic “performance matters” claim.
CL-16 Reversibility, recovery and proportionate governance OI-PROP-DEC-011, OI-PROP-EXE-015, OI-PROP-EXE-016, OI-PROP-EXE-011, OI-PROP-EXE-017 Retain with separate ownership for decision reversibility, operational recovery, rollback and compensation.
CL-17 Reliability, safety, robustness, resilience and adaptation OI-PROP-EXE-010, OI-PROP-EXE-011, OI-PROP-EXE-012, OI-PROP-EXE-003, OI-PROP-EXE-009, OI-PROP-ADP-022 Preserve technical and organisational distinctions; resist umbrella use of resilience.
CL-18 Repair, workarounds and debt OI-PROP-COO-016, OI-PROP-EXE-014, OI-PROP-LRN-007, OI-PROP-ADP-017, OI-PROP-ADP-015 Retain domain terms; develop one system-level proposition on repeated repair concealing structural weakness.
CL-19 Learning persistence and institutionalisation OI-PROP-LRN-009, OI-PROP-LRN-011, OI-PROP-LRN-010, OI-PROP-LRN-024, OI-PROP-ADP-001, OI-PROP-ADP-014, OI-PROP-ADP-005, OI-PROP-ADP-006 Retain; reconcile the learning-to-capability transition and the risk of institutionalising error.
CL-20 Change, learning and adaptation OI-PROP-LRN-025, OI-PROP-LRN-019, OI-PROP-LRN-008, OI-PROP-ADP-001, OI-PROP-ADP-027, OI-PROP-ADP-020, OI-PROP-ADP-021 Retain staged distinctions; consolidate the loop-closure claim in Chapter 10.
CL-21 Measurement reactivity, evaluation and use OI-PROP-EVL-010, OI-PROP-EVL-013, OI-PROP-EVL-011, OI-PROP-EVL-014, OI-PROP-EVL-015, OI-PROP-EVL-016 Retain as a measurement-governance family; do not reduce to a single Goodhart statement.
CL-22 Organisational memory is not storage OI-PROP-LRN-022, OI-PROP-LRN-002, OI-PROP-LRN-020, OI-PROP-LRN-001, OI-PROP-LRN-018, OI-PROP-LRN-003, OI-PROP-LRN-005 Retain; Chapter 10 should position memory as continuity infrastructure.
CL-23 Exploration, exploitation and path dependence OI-PROP-ADP-019, OI-PROP-ADP-016, OI-PROP-ADP-013, OI-PROP-ADP-014, OI-PROP-ADP-017, OI-PROP-ADP-015 Retain as an adaptation portfolio and lifecycle family.
CL-24 Capability transfer, scaling and absorptive capacity OI-PROP-KNW-007, OI-PROP-ADP-010, OI-PROP-ADP-009, OI-PROP-ADP-011, OI-PROP-ADP-012 Retain separate propositions and integrate them as a capability-movement sequence.
CL-25 Coordination, interdependence and local–system alignment OI-PROP-COO-001, OI-PROP-COO-004, OI-PROP-COO-002, OI-PROP-COO-003, OI-PROP-COO-015, OI-PROP-COO-014 Retain; Chapter 5 remains the semantic owner and Chapter 10 uses the integrated condition.

8. Full Proposition Register

The proposition statement is reproduced exactly from the source chapter. Preferred glossary terms are indexing aids and do not replace the source statement.

8.1 OI-BOK-001 — Signals and Attention

Stable ID Proposition Basis / confidence Evidence Glossary terms Clusters Disposition Validate
OI-PROP-SEN-001 Attention Precedes Organisational Orientation
A signal cannot influence organisational orientation unless it enters an attention structure capable of retaining, routing and contextualising it.
Source: P1 in Project-OI-BOK-001-Signals-and-Attention-v0.3.md
S / Moderate SEN-E1; SEN-E9 Attention; Signal; Organisational Context — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V6, V8
OI-PROP-SEN-002 Information Quantity Is Not Attention Quality
Increasing available information may reduce Organisational Intelligence where it increases attention demand faster than the organisation’s ability to filter and contextualise it.
Source: P2 in Project-OI-BOK-001-Signals-and-Attention-v0.3.md
D / High SEN-E2 Attention; Signal; Organisational Context CL-07 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V8
OI-PROP-SEN-003 Attention Structures Shape Behaviour
Organisational behaviour is influenced by the rules, roles, relationships and systems that determine which issues and possible responses receive attention.
Source: P3 in Project-OI-BOK-001-Signals-and-Attention-v0.3.md
D / High SEN-E1 Attention; Signal; Role — RAD — Retain pending final adversarial and construct-boundary review. V1, V6, V8
OI-PROP-SEN-004 Weak Signals Require Graduated Commitment
Weak signals are best handled through progressive attention, evidence gathering and reversible response rather than binary dismissal or full escalation.
Source: P4 in Project-OI-BOK-001-Signals-and-Attention-v0.3.md
D / High SEN-E4 Attention; Signal; Provenance — RAD — Retain pending final adversarial and construct-boundary review. V1, V6, V8
OI-PROP-SEN-005 Dissent Is an Attention Resource
Preserving competing interpretations can improve orientation where uncertainty is material and premature consensus would suppress useful evidence.
Source: P5 in Project-OI-BOK-001-Signals-and-Attention-v0.3.md
S / Moderate SEN-E3; SEN-E5; SEN-E6 Attention; Signal; Provenance CL-06 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V7, V8
OI-PROP-SEN-006 Attention Requires Ownership
Signals that receive visibility but no responsible owner, decision pathway or review point are unlikely to influence persistent organisational response.
Source: P6 in Project-OI-BOK-001-Signals-and-Attention-v0.3.md
O / Moderate–Low SEN-E9 Attention; Signal; Decision — ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-SEN-007 Expertise Should Influence Routing
Relevant expertise, rather than hierarchy alone, should influence who evaluates and responds to a signal.
Source: P7 in Project-OI-BOK-001-Signals-and-Attention-v0.3.md
S / Moderate SEN-E7; SEN-E9 Attention; Signal; Expertise — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V8
OI-PROP-SEN-008 Automation Can Create Attention Failure
AI and automated systems may improve detection while simultaneously increasing noise, hiding uncertainty or misallocating organisational attention.
Source: P8 in Project-OI-BOK-001-Signals-and-Attention-v0.3.md
A / Moderate–Low SEN-E8 Attention; Signal; Agent Execution Envelope — RAI — Retain with explicit task, model, setting and time qualification. V1, V3, V4, V5, V6, V7, V8
OI-PROP-SEN-009 Context Determines Priority
Signal priority should reflect organisational context and potential consequence, not only frequency, recency or source seniority.
Source: P9 in Project-OI-BOK-001-Signals-and-Attention-v0.3.md
D / High SEN-E1; SEN-E3 Attention; Signal; Organisational Context CL-08 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V8
OI-PROP-SEN-010 Attention Must Connect Forward
Attention contributes to Organisational Intelligence only when it can influence orientation, response or deliberate monitoring.
Source: P10 in Project-OI-BOK-001-Signals-and-Attention-v0.3.md
O / Moderate–Low SEN-E9 Attention; Signal CL-01 C10 — Consolidate into the Chapter 10 Connection Quality and loop-closure proposition; retain chapter source statement for traceability. V1, V2, V3, V4, V6, V7, V8

8.2 OI-BOK-002 — Organisational Context

Stable ID Proposition Basis / confidence Evidence Glossary terms Clusters Disposition Validate
OI-PROP-CTX-001 Context Determines Organisational Meaning
The organisational meaning of information depends on the relationships, time, purpose, authority and situation in which it is used.
Source: P1 in Project-OI-BOK-002-Organisational-Context-v0.3.md
D / High CTX-E1; CTX-E2 Organisational Context; Contextualise; Purpose; Action Authority — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V6, V7, V8
OI-PROP-CTX-002 More Context Is Not Necessarily Better
Context quality depends on relevance and integrity rather than volume.
Source: P2 in Project-OI-BOK-002-Organisational-Context-v0.3.md
S / Moderate CTX-E1; CTX-E5 Organisational Context; Contextualise CL-07 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V6, V8
OI-PROP-CTX-003 Context Must Be Purpose-Bound
Context assembled without a defined purpose will tend towards overload, ambiguity or false completeness.
Source: P3 in Project-OI-BOK-002-Organisational-Context-v0.3.md
S / Moderate CTX-E1; CTX-E6 Organisational Context; Contextualise; Purpose CL-08 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V6, V8
OI-PROP-CTX-004 Context Is a View, Not a Copy
Organisational context should be assembled as a bounded view over connected sources rather than duplicated into static packets wherever possible.
Source: P4 in Project-OI-BOK-002-Organisational-Context-v0.3.md
O / Moderate–Low CTX-E6 Organisational Context; Contextualise — ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-CTX-005 Context Must Preserve Time
Organisational systems that cannot distinguish historical from current context will misapply knowledge and distort accountability.
Source: P5 in Project-OI-BOK-002-Organisational-Context-v0.3.md
S / Moderate CTX-E1; CTX-E6 Organisational Context; Contextualise; Organisational Knowledge; Accountability CL-09 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V7, V8
OI-PROP-CTX-006 Context Must Preserve Provenance
A context statement without source and transformation history is difficult to challenge, correct or trust.
Source: P6 in Project-OI-BOK-002-Organisational-Context-v0.3.md
S / Moderate CTX-E6 Organisational Context; Contextualise; Provenance CL-10 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V6, V8
OI-PROP-CTX-007 Context Is Partly Tacit
No representation of organisational context should be assumed to reproduce the whole situated understanding of experienced participants.
Source: P7 in Project-OI-BOK-002-Organisational-Context-v0.3.md
D / High CTX-E3 Organisational Context; Contextualise — RAD — Retain pending final adversarial and construct-boundary review. V1, V6, V8
OI-PROP-CTX-008 Handoffs Are Context-Risk Boundaries
The probability of context loss increases when work crosses roles, teams, systems, organisations or human–AI boundaries.
Source: P8 in Project-OI-BOK-002-Organisational-Context-v0.3.md
S / Moderate CTX-E4; CTX-E6 Organisational Context; Contextualise; Agent Execution Envelope; Handoff; Role CL-11 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V5, V6, V8
OI-PROP-CTX-009 Authority Is Context
Organisational response quality depends on knowing not only what should happen, but who may decide and act.
Source: P9 in Project-OI-BOK-002-Organisational-Context-v0.3.md
S / Moderate CTX-E6 Organisational Context; Contextualise; Action Authority CL-05 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V6, V7, V8
OI-PROP-CTX-010 Context Must Remain Contestable
Context becomes dangerous when uncertain interpretation is presented as fixed organisational fact.
Source: P10 in Project-OI-BOK-002-Organisational-Context-v0.3.md
S / Moderate CTX-E2; CTX-E6 Organisational Context; Contextualise CL-06 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V6, V7, V8
OI-PROP-CTX-011 AI Context Requires Organisational Governance
AI context engineering is an organisational design problem where source authority, permissions, memory and accountability affect model behaviour.
Source: P11 in Project-OI-BOK-002-Organisational-Context-v0.3.md
A / Moderate–Low CTX-E5; CTX-E7 Organisational Context; Contextualise; Agent Execution Envelope; Action Authority; Accountability CL-14 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V5, V6, V7, V8
OI-PROP-CTX-012 Context Should Learn From Use
Outcomes and corrections should improve both the underlying sources and the rules used to assemble future context.
Source: P12 in Project-OI-BOK-002-Organisational-Context-v0.3.md
O / Moderate–Low CTX-E8 Organisational Context; Contextualise; Outcome CL-01 C10 — Consolidate into the Chapter 10 Connection Quality and loop-closure proposition; retain chapter source statement for traceability. V1, V2, V3, V4, V6, V7, V8
OI-PROP-CTX-013 Shared Context Does Not Require Full Consensus
Organisations can coordinate through sufficiently aligned, evidence-bearing context while preserving legitimate disagreement.
Source: P13 in Project-OI-BOK-002-Organisational-Context-v0.3.md
D / High CTX-E4; CTX-E6 Organisational Context; Contextualise; Provenance CL-06 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V7, V8
OI-PROP-CTX-014 Context Capability Reduces Repeated Discovery
Stronger contextual capability should reduce the cost of reconstructing knowledge the organisation already possesses.
Source: P14 in Project-OI-BOK-002-Organisational-Context-v0.3.md
O / Moderate–Low CTX-E8 Organisational Context; Contextualise; Organisational Knowledge; Organisational Capability — ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8

8.3 OI-BOK-003 — Knowledge and Expertise

Stable ID Proposition Basis / confidence Evidence Glossary terms Clusters Disposition Validate
OI-PROP-KNW-001 Possession Is Not Availability
Knowledge held somewhere in the organisation contributes to Organisational Intelligence only where it can be located, accessed and applied.
Source: P1 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
S / Moderate KNW-E4; KNW-E5 Organisational Knowledge; Expertise CL-04 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V8
OI-PROP-KNW-002 Expertise Coordination Matters
Organisational performance depends not only on the expertise present, but on knowing where it resides, where it is needed and how to bring it to bear.
Source: P2 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
D / High KNW-E1 Organisational Knowledge; Expertise; Coordination — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V8
OI-PROP-KNW-003 Experience Is an Imperfect Proxy
Years of experience will predict useful expertise less reliably than the quality, variety and feedback structure of the experience.
Source: P3 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
D / High KNW-E3 Organisational Knowledge; Expertise; Feedback — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V6, V8
OI-PROP-KNW-004 Knowledge Is Distributed
Organisational knowledge resides across people, relationships, practices, routines, artefacts, systems and external ties.
Source: P4 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
S / Moderate KNW-E2; KNW-E5 Organisational Knowledge; Expertise — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V8
OI-PROP-KNW-005 Knowing Is Enacted
A documented description of work is not equivalent to the collective capability to perform it.
Source: P5 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
D / High KNW-E2 Organisational Knowledge; Expertise; Organisational Capability — RAD — Retain pending final adversarial and construct-boundary review. V1, V6, V8
OI-PROP-KNW-006 Tacit Knowledge Cannot Be Fully Captured
Organisational systems should externalise useful knowledge while preserving access to situated expertise and the limits of representation.
Source: P6 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
D / High KNW-E2 Organisational Knowledge; Expertise — RAD — Retain pending final adversarial and construct-boundary review. V1, V8
OI-PROP-KNW-007 Transfer Requires Recontextualisation
Knowledge transfer succeeds when the receiving context can adapt and enact the relevant mechanism, not merely receive a copy.
Source: P7 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
D / High KNW-E5 Organisational Knowledge; Expertise; Organisational Context; Knowledge Transfer CL-03; CL-24 SCP — Retain with an explicit scope qualifier distinguishing knowledge transfer from capability transfer. V1, V2, V4, V6, V8
OI-PROP-KNW-008 Knowledge Authority Differs From Decision Authority
Stronger organisational response requires explicit connection between credible knowledge and legitimate authority.
Source: P8 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
O / Moderate–Low KNW-E7 Organisational Knowledge; Expertise; Knowledge Authority; Decision CL-05 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-KNW-009 Relationships Are Part of Knowledge Access
Knowing who knows what is insufficient without trust, timely access and a usable relationship.
Source: P9 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
D / High KNW-E4 Organisational Knowledge; Expertise — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V8
OI-PROP-KNW-010 Expertise Concentration Creates Fragility
Capability dependent on one person may be operationally effective while remaining weak as Organisational Intelligence.
Source: P10 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
O / Moderate–Low KNW-E1; KNW-E4; KNW-E7 Organisational Knowledge; Expertise; Organisational Capability CL-12 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-KNW-011 Search Is Not Expertise
Retrieval systems improve access to representations but do not automatically provide reformulation, validation, legitimation or judgement.
Source: P11 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
D / High KNW-E4 Organisational Knowledge; Expertise CL-07 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V7, V8
OI-PROP-KNW-012 AI Can Distribute Expert Patterns
AI can accelerate novice performance where expert-derived patterns are represented well and the task falls within the model’s capability.
Source: P12 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
A / Moderate–Low KNW-E6 Organisational Knowledge; Expertise; Agent Execution Envelope; Organisational Capability CL-13 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-KNW-013 AI Can Weaken Learning
AI assistance may improve immediate output while reducing opportunities for experiential learning, skill development or original expert contribution.
Source: P13 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
A / Moderate–Low KNW-E6 Organisational Knowledge; Expertise; Agent Execution Envelope; Organisational Learning CL-13 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-KNW-014 Human–AI Expertise Requires Task Fit
Human–AI combinations will not consistently outperform the strongest human or AI alternative without appropriate task and interaction design.
Source: P14 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
A / Moderate–Low KNW-E6 Organisational Knowledge; Expertise; Agent Execution Envelope CL-13 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V5, V6, V7, V8
OI-PROP-KNW-015 Expertise Must Remain Contestable
Expert status and AI confidence should not prevent evidence, dissent or later outcomes from challenging a judgement.
Source: P15 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
S / Moderate KNW-E7 Organisational Knowledge; Expertise; Agent Execution Envelope; Provenance; Outcome CL-06 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-KNW-016 Use Must Improve Future Availability
Expert involvement strengthens Organisational Intelligence where rationale and outcomes improve future knowledge, routing and capability.
Source: P16 in Project-OI-BOK-003-Knowledge-and-Expertise-v0.3.md
O / Moderate–Low KNW-E8 Organisational Knowledge; Expertise; Outcome; Organisational Capability CL-01 C10 — Consolidate into the Chapter 10 Connection Quality and loop-closure proposition; retain chapter source statement for traceability. V1, V2, V3, V4, V6, V7, V8

8.4 OI-BOK-004 — Decision and Authority

Stable ID Proposition Basis / confidence Evidence Glossary terms Clusters Disposition Validate
OI-PROP-DEC-001 An Answer Is Not a Decision
An answer contributes to organisational response only where an authorised actor or mechanism converts it into a bounded commitment.
Source: P1 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
O / Moderate–Low DEC-E10 Decision; Decision Right — ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-DEC-002 Decisions Require Attribution
Material decisions that cannot be attributed to an authority holder will produce weak accountability and historical reconstruction.
Source: P2 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
S / Moderate DEC-E7; DEC-E10 Decision; Decision Right; Action Authority; Accountability CL-10 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V7, V8
OI-PROP-DEC-003 Formal and Real Authority Differ
Effective decision control will often reside with actors, information systems or defaults outside the formal authority model.
Source: P3 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
D / High DEC-E2 Decision; Decision Right; Formal Authority; Real Authority — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V7, V8
OI-PROP-DEC-004 Decision Rights Should Meet Knowledge
Decision rights should be placed where relevant knowledge can be used at acceptable transfer and control cost.
Source: P4 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
D / High DEC-E2 Decision; Decision Right; Organisational Knowledge; Knowledge Transfer CL-05 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V8
OI-PROP-DEC-005 Authority Must Remain Bounded
Delegation without scope, threshold, evidence, escalation and review will create hidden or inconsistent authority.
Source: P5 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
S / Moderate DEC-E2; DEC-E7; DEC-E10 Decision; Decision Right; Provenance; Formal Authority; Real Authority — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V7, V8
OI-PROP-DEC-006 Decision Process Matters
Decision effectiveness depends partly on framing, evidence, procedural rationality, political behaviour and implementation, not only the external environment.
Source: P6 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
D / High DEC-E1; DEC-E3 Decision; Decision Right; Provenance — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V8
OI-PROP-DEC-007 Unique Information Requires Structure
Group discussion alone will not reliably surface decision-relevant information held by only one or a few participants.
Source: P7 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
D / High DEC-E4 Decision; Decision Right — RAD — Retain pending final adversarial and construct-boundary review. V1, V8
OI-PROP-DEC-008 Dissent Can Improve Decisions
Task-focused dissent can improve assumption and option quality where psychological safety, competence and integration are sufficient.
Source: P8 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
D / High DEC-E5; DEC-E6 Decision; Decision Right; Safety CL-06 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V7, V8
OI-PROP-DEC-009 Consensus Is Not Decision Quality
Agreement may improve acceptance while concealing missing evidence or weak challenge.
Source: P9 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
S / Moderate DEC-E5 Decision; Decision Right; Provenance CL-06 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V8
OI-PROP-DEC-010 Speed Need Not Mean Less Evidence
Fast decisions can use more current information and alternatives where authority and process are well designed.
Source: P10 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
D / High DEC-E3 Decision; Decision Right; Provenance; Action Authority — RAD — Retain pending final adversarial and construct-boundary review. V1, V7, V8
OI-PROP-DEC-011 Reversibility Should Shape Governance
Decision process, evidence and approval should be proportionate to the difficulty of reversing the complete organisational effect.
Source: P11 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
S / Moderate DEC-E1; DEC-E10 Decision; Decision Right; Provenance CL-16 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V7, V8
OI-PROP-DEC-012 Legitimacy Supports Commitment
People will be more likely to implement decisions they view as appropriately authorised and procedurally fair, even where they disagree with the outcome.
Source: P12 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
D / High DEC-E7 Decision; Decision Right; Outcome — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V6, V7, V8
OI-PROP-DEC-013 Accountability Design Is Contingent
Accountability can improve judgement or create conformity and defensive behaviour depending on timing, audience and evaluation criteria.
Source: P13 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
D / High DEC-E7 Decision; Decision Right; Accountability; Evaluation — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V6, V7, V8
OI-PROP-DEC-014 Outcome Does Not Prove Process Quality
Decision review should distinguish reasonable judgement under uncertainty from luck, implementation and later information.
Source: P14 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
D / High DEC-E8 Decision; Decision Right; Outcome CL-09; CL-15 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-DEC-015 Exceptions Must Remain Exceptional
An exception without scope, authority, time and expiry will drift into invisible policy.
Source: P15 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
S / Moderate DEC-E10 Decision; Decision Right; Action Authority — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V7, V8
OI-PROP-DEC-016 Escalation Is a Capability
A clear escalation route allows local authority to remain bounded without forcing universal centralisation.
Source: P16 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
O / Moderate–Low DEC-E10 Decision; Decision Right; Action Authority; Organisational Capability — ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-DEC-017 AI Cannot Create Authority
AI decision and action rights must originate from explicit organisational delegation and cannot expand through model capability alone.
Source: P17 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
A / Moderate–Low DEC-E9 Decision; Decision Right; Agent Execution Envelope; Organisational Capability; Formal Authority CL-05; CL-14 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V5, V6, V7, V8
OI-PROP-DEC-018 Human Oversight Must Be Specific
Human oversight is meaningful only where the reviewer has relevant context, expertise, time, authority and the ability to alter the result.
Source: P18 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
A / Moderate–Low DEC-E7; DEC-E9 Decision; Decision Right; Organisational Context; Expertise; Action Authority CL-14 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-DEC-019 Consequential AI Needs Decision-Time Traceability
The organisation should preserve the model, context, evidence, delegation and human intervention relevant to consequential AI-supported decisions.
Source: P19 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
A / Moderate–Low DEC-E9; DEC-E10 Decision; Decision Right; Agent Execution Envelope; Organisational Context; Provenance CL-09; CL-14 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-DEC-020 Review Should Improve Decision Architecture
Decision outcomes should update authority, policy, thresholds, evidence requirements and future organisational context.
Source: P20 in Project-OI-BOK-004-Decision-and-Authority-v0.3.md
O / Moderate–Low DEC-E10 Decision; Decision Right; Organisational Context; Provenance; Action Authority CL-01 C10 — Consolidate into the Chapter 10 Connection Quality and loop-closure proposition; retain chapter source statement for traceability. V1, V2, V3, V4, V6, V7, V8

8.5 OI-BOK-005 — Coordination and Collective Action

Stable ID Proposition Basis / confidence Evidence Glossary terms Clusters Disposition Validate
OI-PROP-COO-001 Communication Is Not Coordination
Communication contributes to coordination only where it improves accountability, predictability, common understanding or dependency management.
Source: P1 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
D / High COO-E1; COO-E3; COO-E4 Coordination; Interdependence; Accountability CL-25 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V7, V8
OI-PROP-COO-002 Coordination Manages Interdependence
Coordination requirements are produced by dependencies among activities, resources, interpretations, authority and outcomes.
Source: P2 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
D / High COO-E1 Coordination; Interdependence; Action Authority; Outcome CL-25 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V7, V8
OI-PROP-COO-003 Different Interdependence Requires Different Mechanisms
Coordination quality will decline where pooled, sequential, reciprocal or intensive work is managed as though the dependency structure were identical.
Source: P3 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
D / High COO-E2 Coordination; Interdependence CL-25 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V8
OI-PROP-COO-004 Collective Action Requires Connected Contribution
Aggregate activity becomes collective action only where contributions are oriented and adjusted to a wider system of action.
Source: P4 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
S / Moderate COO-E6; COO-E10 Coordination; Interdependence; Collective Action CL-25 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V8
OI-PROP-COO-005 Decisions Must Be Translated
A legitimate decision will fail to mobilise coordinated work where commitments, dependencies, action ownership and review conditions remain implicit.
Source: P5 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
S / Moderate COO-E10 Coordination; Interdependence; Decision — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V7, V8
OI-PROP-COO-006 Coordination Mechanisms Work Through Integrative Conditions
Plans, meetings, routines, roles and schedules coordinate where they create accountability, predictability and common understanding.
Source: P6 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
D / High COO-E3 Coordination; Interdependence; Accountability; Role — RAD — Retain pending final adversarial and construct-boundary review. V1, V7, V8
OI-PROP-COO-007 Roles Reduce Coordination Load
Stable and visible role expectations allow actors to anticipate one another, but rigid roles can obstruct necessary intervention.
Source: P7 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
D / High COO-E3; COO-E6 Coordination; Interdependence; Role — RAD — Retain pending final adversarial and construct-boundary review. V1, V8
OI-PROP-COO-008 Shared State Must Remain Purpose-Bound and Current
A shared representation improves coordination only where it reflects material state and remains interpretable across roles.
Source: P8 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
S / Moderate COO-E3; COO-E7; COO-E10 Coordination; Interdependence; Purpose; Role; Shared State — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V8
OI-PROP-COO-009 Handoffs Are Dependency Transactions
A handoff is complete when the receiving dependency is accepted, not when the sender transmits an artefact.
Source: P9 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
S / Moderate COO-E1; COO-E8; COO-E10 Coordination; Interdependence; Handoff CL-11 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V8
OI-PROP-COO-010 Common Understanding Does Not Require Uniform Interpretation
Groups can coordinate through compatible views and shared objects while preserving legitimate local knowledge.
Source: P10 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
S / Moderate COO-E3; COO-E6; COO-E8 Coordination; Interdependence; Organisational Knowledge — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V7, V8
OI-PROP-COO-011 Cross-Boundary Coordination May Require Transformation
Information transfer will be insufficient where differences involve meaning, interests, consequences or authority.
Source: P11 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
D / High COO-E8 Coordination; Interdependence; Action Authority; Knowledge Transfer CL-11 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V7, V8
OI-PROP-COO-012 Implicit Coordination Is Conditional
Implicit coordination improves performance where team situation models are sufficiently accurate and stable; it becomes dangerous under novelty, turnover and state ambiguity.
Source: P12 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
D / High COO-E7 Coordination; Interdependence — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V8
OI-PROP-COO-013 Speed Can Depend on Better Coordination
Fast collective action can use clear roles, current information, shared state and active adjustment rather than bypassing coordination.
Source: P13 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
D / High COO-E5; COO-E7 Coordination; Interdependence; Collective Action; Role; Shared State — RAD — Retain pending final adversarial and construct-boundary review. V1, V8
OI-PROP-COO-014 Local Autonomy Requires Dependency Visibility
Local actors can exercise useful autonomy where the wider consequences, limits and escalation paths remain visible.
Source: P14 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
O / Moderate–Low COO-E1; COO-E10 Coordination; Interdependence CL-25 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-COO-015 Coordination Load Is a Design Cost
Organisations should reduce unnecessary dependencies and use mechanisms proportionate to the remaining interdependence.
Source: P15 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
O / Moderate–Low COO-E1; COO-E10 Coordination; Interdependence CL-25 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-COO-016 Repeated Repair Can Conceal Coordination Debt
Successful improvisation will not strengthen coordination where recurring causes are not incorporated into roles, interfaces or Workflows.
Source: P16 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
O / Moderate–Low COO-E5; COO-E10 Coordination; Interdependence; Role CL-18 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-COO-017 AI Can Reproduce Some Team Benefits
AI may improve integration and cross-functional contribution for some tasks without becoming a substitute for authority, human diversity or organisational coordination generally.
Source: P17 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
A / Moderate–Low COO-E9 Coordination; Interdependence; Agent Execution Envelope; Action Authority CL-13 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-COO-018 Human–AI Coordination Requires Shared State and Role Clarity
AI participation will create coordination risk where humans cannot determine what the system knows, owns, changed or expects next.
Source: P18 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
A / Moderate–Low COO-E7; COO-E9 Coordination; Interdependence; Agent Execution Envelope; Role; Shared State CL-13 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V5, V6, V7, V8
OI-PROP-COO-019 More Agents Do Not Create Collective Intelligence
Multi-Agent performance depends on governed dependencies, context, authority and output integration rather than Agent count.
Source: P19 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
A / Moderate–Low COO-E9; COO-E10 Coordination; Interdependence; Agent Execution Envelope; Organisational Context; Action Authority — RAI — Retain with explicit task, model, setting and time qualification. V1, V3, V4, V5, V6, V7, V8
OI-PROP-COO-020 Coordination Must Connect to Outcome and Learning
Coordination strengthens Organisational Intelligence where consequences improve future dependency design, role structure and shared memory.
Source: P20 in Project-OI-BOK-005-Coordination-and-Collective-Action-v0.3.md
O / Moderate–Low COO-E10 Coordination; Interdependence; Role; Outcome; Organisational Memory CL-01 C10 — Consolidate into the Chapter 10 Connection Quality and loop-closure proposition; retain chapter source statement for traceability. V1, V2, V3, V4, V6, V7, V8

8.6 OI-BOK-006 — Execution and Operational Reliability

Stable ID Proposition Basis / confidence Evidence Glossary terms Clusters Disposition Validate
OI-PROP-EXE-001 Execution Is Distinct From Decision and Outcome
An authorised decision contributes to Organisational Intelligence only where it becomes controlled execution, and execution should not be treated as proof of outcome.
Source: P1 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
S / Moderate EXE-E11 Execution; Operational Reliability; Decision; Outcome CL-15 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V8
OI-PROP-EXE-002 Operational Intent Enables Fidelity
Execution reliability improves where purpose, protected constraints, expected state change and failure behaviour are explicit.
Source: P2 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
O / Moderate–Low EXE-E1; EXE-E11 Execution; Operational Reliability; Purpose; Operational Intent; Reliability — ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-EXE-003 Reliability Is Conditional
Reliability can be evaluated only relative to a defined service, boundary, condition and period.
Source: P3 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E2 Execution; Operational Reliability; Reliability CL-17 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-EXE-004 Control Should Be Enabling
Formalisation will support reliability more effectively where it helps actors understand, detect and repair work rather than merely enforce compliance.
Source: P4 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E1 Execution; Operational Reliability; Reliability — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V6, V8
OI-PROP-EXE-005 Routines Are Performed, Not Merely Specified
Variation between documented and actual work is an inherent feature of organisational routines and a potential source of both resilience and risk.
Source: P5 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E1 Execution; Operational Reliability; Resilience — RAD — Retain pending final adversarial and construct-boundary review. V1, V8
OI-PROP-EXE-006 Readiness Is a Material State
A schedule or approval should not substitute for evidence that authority, prerequisites, capacity, observability and recovery are sufficient.
Source: P6 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
S / Moderate EXE-E11 Execution; Operational Reliability; Provenance; Action Authority; Recovery — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V6, V7, V8
OI-PROP-EXE-007 Observability Is Required for Control
An organisation cannot govern material execution reliably where current state, deviation and effect cannot be inferred.
Source: P7 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
S / Moderate EXE-E2; EXE-E4 Execution; Operational Reliability — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V7, V8
OI-PROP-EXE-008 Completion Requires Integrity
Terminal status should represent actual effect, unresolved ambiguity and receiving acceptance rather than local task cessation.
Source: P8 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
O / Moderate–Low EXE-E11 Execution; Operational Reliability CL-11 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-EXE-009 Reliability and Safety Differ
Reliable performance of an unsafe or illegitimate function does not constitute responsible Organisational Intelligence.
Source: P9 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E2; EXE-E4 Execution; Operational Reliability; Reliability; Safety CL-17 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V7, V8
OI-PROP-EXE-010 Complexity and Tight Coupling Increase Systemic Risk
Interactively complex and tightly coupled execution will be more vulnerable to rapid and unanticipated failure propagation.
Source: P10 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E4 Execution; Operational Reliability CL-17 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V8
OI-PROP-EXE-011 Robustness and Resilience Differ
Tolerance of expected variation should not be confused with the capacity to recover or extend performance under surprise.
Source: P11 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E6 Execution; Operational Reliability; Resilience; Robustness CL-16; CL-17 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-EXE-012 Slack Supports Resilience
Elimination of all spare capacity can improve average efficiency while increasing brittleness and recovery risk.
Source: P12 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E6 Execution; Operational Reliability; Resilience; Recovery CL-17 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-EXE-013 Errors Are System Evidence
Error analysis should examine the conditions and defences of the operational system rather than defaulting to individual blame.
Source: P13 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E5 Execution; Operational Reliability; Provenance — RAD — Retain pending final adversarial and construct-boundary review. V1, V8
OI-PROP-EXE-014 Workarounds Can Conceal Operational Debt
Frontline repair can preserve immediate performance while reducing organisational visibility of recurring failure.
Source: P14 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E7 Execution; Operational Reliability; Workaround CL-18 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V8
OI-PROP-EXE-015 Recovery Must Be Designed and Tested
Backup, rollback and failover claims are weak until restoration and state integrity have been demonstrated under realistic conditions.
Source: P15 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E6; EXE-E9 Execution; Operational Reliability; Recovery; Rollback CL-16 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V8
OI-PROP-EXE-016 Compensation Is Not Rollback
Where external or organisational effects have occurred, recovery may require new accountable actions rather than fictional restoration of the past.
Source: P16 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E9 Execution; Operational Reliability; Recovery; Rollback; Compensation CL-16 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V7, V8
OI-PROP-EXE-017 Retry Can Amplify Failure
Repetition of an uncertain or overloaded action will reduce reliability where idempotency, classification, budget and backoff are inadequate.
Source: P17 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E9 Execution; Operational Reliability; Reliability CL-16 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-EXE-018 High Reliability Requires Attention to Weak Failure Evidence
Absence of recent harm should not reduce attention to anomalies, near misses and operational drift.
Source: P18 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E3; EXE-E5 Execution; Operational Reliability; Attention; Provenance; Reliability — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V6, V7, V8
OI-PROP-EXE-019 Human Variability Is Both Risk and Resource
People create error and also supply detection, interpretation and adaptive repair that automated systems may lack.
Source: P19 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
D / High EXE-E5; EXE-E8 Execution; Operational Reliability — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V8
OI-PROP-EXE-020 Automation Redistributes Work
Automation changes rather than eliminates human responsibility, skill, situation awareness and coordination demand.
Source: P20 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
A / Moderate–Low EXE-E8 Execution; Operational Reliability; Agent Execution Envelope; Coordination CL-13 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V5, V6, V7, V8
OI-PROP-EXE-021 Human Intervention Must Be Operationally Real
Human oversight is weak where the person lacks current state, expertise, time, authority or an effective control.
Source: P21 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
A / Moderate–Low EXE-E8; EXE-E10 Execution; Operational Reliability; Expertise; Action Authority CL-14 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-EXE-022 AI Capability Does Not Confer Action Authority
Agent execution rights must originate from explicit organisational identity and delegation.
Source: P22 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
A / Moderate–Low EXE-E10; EXE-E11 Execution; Operational Reliability; Agent Execution Envelope; Action Authority; Organisational Capability CL-05; CL-14 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V5, V6, V7, V8
OI-PROP-EXE-023 Agent Reliability Is End-to-End
Model response quality alone cannot establish reliable execution where planning, tools, state, authority, verification and external effects are involved.
Source: P23 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
A / Moderate–Low EXE-E10 Execution; Operational Reliability; Agent Execution Envelope; Action Authority; Reliability CL-14 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-EXE-024 Multi-Agent Execution Increases Coordination Requirements
Specialisation among Agents can improve capability while increasing dependency, integration and failure-amplification risk.
Source: P24 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
A / Moderate–Low EXE-E10 Execution; Operational Reliability; Agent Execution Envelope; Coordination; Organisational Capability — RAI — Retain with explicit task, model, setting and time qualification. V1, V3, V4, V5, V6, V7, V8
OI-PROP-EXE-025 Operational Evidence Enables Improvement
Execution strengthens Organisational Intelligence where material state, intervention, failure and recovery can be transferred into outcome evaluation and learning.
Source: P25 in Project-OI-BOK-006-Execution-and-Operational-Reliability-v0.3.md
O / Moderate–Low EXE-E11 Execution; Operational Reliability; Provenance; Recovery; Outcome CL-01; CL-10 C10 — Consolidate into the Chapter 10 Connection Quality and loop-closure proposition; retain chapter source statement for traceability. V1, V2, V3, V4, V6, V7, V8

8.7 OI-BOK-007 — Outcomes, Feedback and Evaluation

Stable ID Proposition Basis / confidence Evidence Glossary terms Clusters Disposition Validate
OI-PROP-EVL-001 Output Is Not Outcome
Organisational activity and deliverables should not be treated as evidence that the intended consequential change occurred.
Source: P1 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
S / Moderate EVL-E1; EVL-E10 Outcome; Evaluation; Provenance CL-15 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V8
OI-PROP-EVL-002 Outcome Requires a Stakeholder and Value Frame
Whether a change is an improvement depends on who experiences it, which purpose and value criteria apply and over which time horizon.
Source: P2 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
S / Moderate EVL-E1; EVL-E10 Outcome; Evaluation; Purpose CL-08 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V8
OI-PROP-EVL-003 Feedback Is Not Learning
Data about consequence contributes to Organisational Intelligence only where it is connected to prior action, interpreted credibly and transferred into a learning process.
Source: P3 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
S / Moderate EVL-E6; EVL-E10 Outcome; Evaluation; Feedback; Organisational Learning; Knowledge Transfer CL-02 MRG — Merge into OI-PROP-LRN-007 for the final proposition set; preserve Chapter 7 provenance and bridge wording. V1, V2, V3, V4, V8
OI-PROP-EVL-004 Outcome Pathways Are Hypotheses
Logic models and theories of change support explanation and testing but do not establish causality by representation alone.
Source: P4 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E3 Outcome; Evaluation — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V6, V8
OI-PROP-EVL-005 Implementation Must Be Distinguished From Intervention Effect
Weak outcomes cannot be interpreted adequately without knowing whether and how the intervention was implemented.
Source: P5 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E4 Outcome; Evaluation CL-15 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-EVL-006 Causal Claims Require Counterfactual Discipline
Observed change after action is insufficient evidence that the action caused the change.
Source: P6 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E2 Outcome; Evaluation; Provenance — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V8
OI-PROP-EVL-007 Contribution Can Be More Credible Than False Attribution
In multi-causal organisational settings, a tested contribution claim may be more useful and honest than an unsupported claim of sole causation.
Source: P7 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
S / Moderate EVL-E3 Outcome; Evaluation — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V8
OI-PROP-EVL-008 Unintended and Unanticipated Differ
Organisations should distinguish effects not intended from effects not anticipated because the governance and learning implications differ.
Source: P8 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E1 Outcome; Evaluation; Organisational Learning — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V7, V8
OI-PROP-EVL-009 Average Outcomes Can Conceal Harm
Aggregate improvement should not be treated as responsible Organisational Intelligence where material subgroup or external harms remain hidden.
Source: P9 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
S / Moderate EVL-E1; EVL-E10 Outcome; Evaluation — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V7, V8
OI-PROP-EVL-010 Measurement Purpose Determines Measure Fitness
No single performance measure will support control, accountability, learning, motivation and impact evaluation equally well.
Source: P10 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E7 Outcome; Evaluation; Purpose; Accountability; Measurement CL-21 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V7, V8
OI-PROP-EVL-011 Validity Precedes Dashboarding
A precise and timely metric is weak evidence where it does not represent the intended construct.
Source: P11 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E7 Outcome; Evaluation; Provenance; Measurement CL-07; CL-10; CL-21 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-EVL-012 Feedback Delay Distorts Learning
Long, variable and hidden delays increase the probability that organisations will attribute outcomes to the wrong actions or overcorrect.
Source: P12 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E6 Outcome; Evaluation; Feedback; Organisational Learning — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V6, V8
OI-PROP-EVL-013 Measures Are Organisational Interventions
Material measures change behaviour, priorities and identity and should be evaluated for those effects.
Source: P13 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E5 Outcome; Evaluation; Measurement CL-21 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-EVL-014 Target Pressure Can Corrupt Evidence
The more consequential a weak proxy becomes for control or reward, the more likely it is to lose validity and distort the underlying process.
Source: P14 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E5 Outcome; Evaluation; Provenance; Measurement CL-21 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V8
OI-PROP-EVL-015 Evaluation Requires Independence and Context
Evaluation quality will decline where the evaluator is captured by delivery interests or detached from implementation reality.
Source: P15 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E8 Outcome; Evaluation; Organisational Context CL-21 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V8
OI-PROP-EVL-016 Evaluation Use Must Be Designed
Credible findings do not influence organisational response automatically.
Source: P16 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E8 Outcome; Evaluation CL-21 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V8
OI-PROP-EVL-017 Process and Outcome Quality Differ
Good outcomes can follow weak processes and poor outcomes can follow reasonable decisions under uncertainty.
Source: P17 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
D / High EVL-E1; EVL-E7 Outcome; Evaluation; Decision CL-15 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-EVL-018 Outcome Observation Should Be Multi-Method
Quantitative, qualitative, operational and stakeholder evidence will often be necessary to understand organisational consequences.
Source: P18 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
S / Moderate EVL-E1; EVL-E8 Outcome; Evaluation; Provenance — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V8
OI-PROP-EVL-019 Feedback Completeness Is Bounded
Organisations cannot observe every consequence but should make material exclusions, blind spots and stakeholder gaps explicit.
Source: P19 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
O / Moderate–Low EVL-E10 Outcome; Evaluation; Feedback — ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-EVL-020 AI Evaluation Must Match the Claim Boundary
Model metrics support claims about models, while organisational outcome claims require evaluation of the complete human–AI sociotechnical system.
Source: P20 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
A / Moderate–Low EVL-E9 Outcome; Evaluation; Agent Execution Envelope; Measurement CL-13 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-EVL-021 Post-Deployment AI Evaluation Is Necessary
Consequential AI outcomes may change through model updates, data drift, human adaptation and organisational context even where the nominal use case remains unchanged.
Source: P21 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
A / Moderate–Low EVL-E9 Outcome; Evaluation; Agent Execution Envelope; Organisational Context; Adaptation — RAI — Retain with explicit task, model, setting and time qualification. V1, V3, V4, V5, V6, V7, V8
OI-PROP-EVL-022 AI Self-Evaluation Is Insufficient for Consequential Use
A system should not be the sole judge of the outcome or safety of its own material actions.
Source: P22 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
A / Moderate–Low EVL-E9 Outcome; Evaluation; Agent Execution Envelope; Safety — RAI — Retain with explicit task, model, setting and time qualification. V1, V3, V4, V5, V6, V7, V8
OI-PROP-EVL-023 Evaluation Should Preserve Decision-Time Expectations
Outcome review should compare actual consequence with the purpose, assumptions and predictions recorded before the outcome was known.
Source: P23 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
S / Moderate EVL-E1; EVL-E10 Outcome; Evaluation; Purpose; Decision-Time Context; Decision CL-09 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V8
OI-PROP-EVL-024 Evaluation Quality Shapes Learning Quality
Organisational learning will be weak where outcome evidence is invalid, delayed, distorted, politically filtered or causally overclaimed.
Source: P24 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
S / Moderate EVL-E3; EVL-E6; EVL-E10 Outcome; Evaluation; Provenance; Organisational Learning — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V8
OI-PROP-EVL-025 Evaluation Is a Bridge Capability
Outcomes, feedback and evaluation connect mobilisation to learning but do not themselves constitute durable organisational learning.
Source: P25 in Project-OI-BOK-007-Outcomes-Feedback-and-Evaluation-v0.3.md
O / Moderate–Low EVL-E10 Outcome; Evaluation; Feedback; Organisational Learning; Organisational Capability CL-01 C10 — Consolidate into the Chapter 10 Connection Quality and loop-closure proposition; retain chapter source statement for traceability. V1, V2, V3, V4, V6, V7, V8

8.8 OI-BOK-008 — Organisational Memory, Reflection and Learning

Stable ID Proposition Basis / confidence Evidence Glossary terms Clusters Disposition Validate
OI-PROP-LRN-001 Memory Is Not a Repository
Organisational memory depends on distributed retention, reconstruction, retrieval and use rather than storage alone.
Source: P1 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
D / High LRN-E1 Organisational Memory; Organisational Learning CL-07; CL-22 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V8
OI-PROP-LRN-002 Memory Is Selective
What an organisation remembers reflects attention, power, incentive and technical affordance as well as objective significance.
Source: P2 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
D / High LRN-E1 Organisational Memory; Organisational Learning; Attention CL-22 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V8
OI-PROP-LRN-003 Memory Is Reconstructive
Organisational remembering will combine historical traces with current context and interpretation rather than reproduce the past exactly.
Source: P3 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
D / High LRN-E1; LRN-E2 Organisational Memory; Organisational Learning; Organisational Context CL-22 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V8
OI-PROP-LRN-004 Retention Is Not Availability
A retained lesson contributes little to Organisational Intelligence where authorised actors cannot locate and interpret it in time.
Source: P4 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
S / Moderate LRN-E1 Organisational Memory; Organisational Learning CL-04 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V8
OI-PROP-LRN-005 Retrieval Must Be Purpose-Bound
Similarity alone is insufficient for selecting organisational memory because relevance depends on current purpose, authority and conditions.
Source: P5 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
S / Moderate LRN-E1; LRN-E2 Organisational Memory; Organisational Learning; Purpose; Action Authority CL-08; CL-22 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V7, V8
OI-PROP-LRN-006 Decision-Time Memory Protects Learning
Preserving what was known and uncertain at the time allows outcome learning without hindsight rewriting.
Source: P6 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
O / Moderate–Low LRN-E2 Organisational Memory; Organisational Learning; Decision-Time Context; Decision; Outcome CL-09 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-LRN-007 Feedback Is Not Learning
Evaluative evidence becomes learning only through reflection, interpretation and retained change in future understanding or response.
Source: P7 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
S / Moderate LRN-E10 Organisational Memory; Organisational Learning; Provenance; Feedback CL-02; CL-18 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V8
OI-PROP-LRN-008 Change Is Not Learning
Behavioural or structural change can occur without improved understanding, while learning may precede visible change.
Source: P8 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
S / Moderate LRN-E3; LRN-E4 Organisational Memory; Organisational Learning CL-20 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V8
OI-PROP-LRN-009 Individual Insight Is Not Organisational Learning
Learning becomes organisational where it is made available beyond the individual and influences shared or repeated work.
Source: P9 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
S / Moderate LRN-E4 Organisational Memory; Organisational Learning CL-19 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V8
OI-PROP-LRN-010 Learning Crosses Levels
Organisational learning depends on conversion among individual insight, group interpretation, integrated action and organisational retention.
Source: P10 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
D / High LRN-E4 Organisational Memory; Organisational Learning CL-19 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V8
OI-PROP-LRN-011 Lessons Require a Lifecycle
Identification, recording, dissemination, application and persistence are distinct conditions.
Source: P11 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
S / Moderate LRN-E5 Organisational Memory; Organisational Learning CL-19 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V8
OI-PROP-LRN-012 Structured Debriefing Can Improve Performance
Debriefs are more likely to support learning where evidence, purpose, alignment, facilitation and follow-up are adequate.
Source: P12 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
D / High LRN-E5 Organisational Memory; Organisational Learning; Purpose; Provenance — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V8
OI-PROP-LRN-013 Success and Failure Produce Different Learning Conditions
Failure may increase attention and search while success may reveal effective mechanism or create overconfidence.
Source: P13 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
S / Moderate LRN-E6 Organisational Memory; Organisational Learning; Attention — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V8
OI-PROP-LRN-014 Near Misses Are Ambiguous Evidence
A near miss can reveal vulnerability or successful defence, but survival can also increase unjustified confidence.
Source: P14 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
S / Moderate LRN-E6 Organisational Memory; Organisational Learning; Provenance — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V8
OI-PROP-LRN-015 Single-Loop and Double-Loop Learning Serve Different Needs
Corrective action is appropriate where governing assumptions remain valid, while repeated or systemic evidence may require questioning the frame.
Source: P15 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
D / High LRN-E3 Organisational Memory; Organisational Learning; Provenance — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V7, V8
OI-PROP-LRN-016 Defensive Routines Block Learning
Organisations will suppress or distort learning where inquiry threatens identity, status or control.
Source: P16 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
D / High LRN-E3 Organisational Memory; Organisational Learning — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V8
OI-PROP-LRN-017 Psychological Safety Is Necessary but Insufficient
Candour supports learning only where evidence, accountability, interpretation and application also exist.
Source: P17 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
S / Moderate LRN-E3; LRN-E5 Organisational Memory; Organisational Learning; Provenance; Accountability; Safety — RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V7, V8
OI-PROP-LRN-018 Forgetting Can Be Functional
Responsible Organisational Intelligence requires both durable historical memory and governed retirement of obsolete or harmful guidance.
Source: P18 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
D / High LRN-E7 Organisational Memory; Organisational Learning CL-22 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V7, V8
OI-PROP-LRN-019 Unlearning Is Not Deletion
Discontinuing an assumption or routine requires changed theory-in-use, not merely removal of a record.
Source: P19 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
S / Moderate LRN-E7 Organisational Memory; Organisational Learning CL-20 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V8
OI-PROP-LRN-020 Memory Can Create Inertia
Rich organisational memory can improve continuity while reducing exploration and adaptation under changed conditions.
Source: P20 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
D / High LRN-E1; LRN-E7 Organisational Memory; Organisational Learning; Adaptation; Exploration CL-22 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V8
OI-PROP-LRN-021 Vicarious Learning Requires Recontextualisation
External experience becomes useful only where mechanism, evidence and receiving conditions are understood.
Source: P21 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
D / High LRN-E8 Organisational Memory; Organisational Learning; Organisational Context; Provenance CL-03; CL-11 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-LRN-022 AI Memory Is Not Organisational Memory
Persistent model context or retrieval improves access to records but does not reproduce organisational roles, routines, authority and social memory.
Source: P22 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
A / Moderate–Low LRN-E9; LRN-E10 Organisational Memory; Organisational Learning; AI Memory; Agent Execution Envelope; Organisational Context CL-14; CL-22 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-LRN-023 AI Memory Requires Provenance and Security
Agent memory will create organisational risk where source, transformation, permission, update and poisoning are not governed.
Source: P23 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
A / Moderate–Low LRN-E9 Organisational Memory; Organisational Learning; AI Memory; Agent Execution Envelope; Provenance CL-10; CL-14 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V5, V6, V7, V8
OI-PROP-LRN-024 Learning Persistence Requires Use
A lesson becomes durable where it remains retrievable, is applied in future work and survives changes in personnel and context.
Source: P24 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
O / Moderate–Low LRN-E1; LRN-E5; LRN-E10 Organisational Memory; Organisational Learning; Organisational Context CL-04; CL-19 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-LRN-025 Learning Quality Shapes Adaptation Quality
Capability change will be weak or harmful where the retained learning is inaccurate, overgeneralised, politically filtered or context-stripped.
Source: P25 in Project-OI-BOK-008-Organisational-Memory-Reflection-and-Learning-v0.3.md
O / Moderate–Low LRN-E10 Organisational Memory; Organisational Learning; Organisational Context; Organisational Capability; Adaptation CL-01; CL-20 C10 — Consolidate into the Chapter 10 Connection Quality and loop-closure proposition; retain chapter source statement for traceability. V1, V2, V3, V4, V6, V7, V8

8.9 OI-BOK-009 — Capability Development and Adaptation

Stable ID Proposition Basis / confidence Evidence Glossary terms Clusters Disposition Validate
OI-PROP-ADP-001 Learning Is Not Capability
Organisational learning becomes capability only where changed understanding is enacted reliably through organisational arrangements beyond one individual or episode.
Source: P1 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
S / Moderate ADP-E3; ADP-E11 Organisational Capability; Adaptation; Organisational Learning CL-04; CL-19; CL-20 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V8
OI-PROP-ADP-002 Capability Is Configurational
Organisational capability emerges from the integration of people, knowledge, routines, authority, relationships, technology and resources rather than from any one element.
Source: P2 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E1; ADP-E2; ADP-E3 Organisational Capability; Adaptation; Organisational Knowledge; Action Authority — RAD — Retain pending final adversarial and construct-boundary review. V1, V6, V7, V8
OI-PROP-ADP-003 Capability Is Distinct From Performance
Strong performance in one episode is insufficient evidence of repeatable organisational capability.
Source: P3 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E2; ADP-E11 Organisational Capability; Adaptation; Provenance CL-15 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-ADP-004 Capability Claims Require Boundaries
Capability should be stated relative to a class of work, organisational unit, operating conditions and evidence.
Source: P4 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
O / Moderate–Low ADP-E11 Organisational Capability; Adaptation; Provenance CL-08 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-ADP-005 Institutionalisation Requires Practice and Authority
Documentation and training will not institutionalise learning where actors lack representative practice, resources or authority.
Source: P5 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E3 Organisational Capability; Adaptation; Action Authority; Organisational Learning; Institutionalisation CL-19 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V7, V8
OI-PROP-ADP-006 Institutionalisation Can Preserve Error
The durability of a routine or system does not establish the validity of the lesson embedded within it.
Source: P6 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
S / Moderate ADP-E3; ADP-E8 Organisational Capability; Adaptation; Measurement; Institutionalisation CL-19 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V8
OI-PROP-ADP-007 Capability Development Uses Several Learning Mechanisms
Experience accumulation, knowledge articulation, codification and practice contribute differently depending on task frequency, variability and causal ambiguity.
Source: P7 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E3 Organisational Capability; Adaptation; Organisational Knowledge; Organisational Learning — RAD — Retain pending final adversarial and construct-boundary review. V1, V4, V6, V8
OI-PROP-ADP-008 Capability Has a Lifecycle
Organisational capabilities form, develop, mature and then branch through renewal, replication, redeployment, retrenchment or retirement.
Source: P8 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E4 Organisational Capability; Adaptation — RAD — Retain pending final adversarial and construct-boundary review. V1, V6, V8
OI-PROP-ADP-009 Distribution Reduces Some Fragility
Capability distributed across appropriate actors and reservoirs will be less dependent on individual availability, but may require stronger coordination and consistency mechanisms.
Source: P9 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
S / Moderate ADP-E3; ADP-E11 Organisational Capability; Adaptation; Coordination CL-12; CL-24 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V6, V8
OI-PROP-ADP-010 Transfer Requires Recontextualisation
Capability transfer succeeds where the receiving unit can enact and govern the mechanism under local conditions rather than merely copy the source artefact.
Source: P10 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
S / Moderate ADP-E7 Organisational Capability; Adaptation; Organisational Context; Knowledge Transfer CL-03; CL-24 SCP — Retain with an explicit scope qualifier distinguishing knowledge transfer from capability transfer. V1, V2, V3, V4, V6, V7, V8
OI-PROP-ADP-011 Scaling Changes Capability Requirements
Increased volume or scope creates new coordination, control, resource and failure conditions that may invalidate evidence from a small pilot.
Source: P11 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
S / Moderate ADP-E4; ADP-E7 Organisational Capability; Adaptation; Provenance; Coordination CL-24 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V6, V8
OI-PROP-ADP-012 External Knowledge Requires Absorptive Capacity
Access to external knowledge or experts becomes organisational capability only where the organisation can recognise, assimilate, transform and apply it.
Source: P12 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E5 Organisational Capability; Adaptation; Organisational Knowledge CL-24 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V8
OI-PROP-ADP-013 Exploitation Tends to Outcompete Exploration
Shorter and more certain returns from current capability create a systematic tendency to underinvest in future alternatives.
Source: P13 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E6 Organisational Capability; Adaptation; Exploration; Exploitation CL-23 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V8
OI-PROP-ADP-014 Exploration Without Institutionalisation Is Incomplete
Experimentation contributes to adaptation only where selection and integration can convert useful variation into operating capability.
Source: P14 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
S / Moderate ADP-E6 Organisational Capability; Adaptation; Exploration; Institutionalisation CL-19; CL-23 RCC — Retain pending cross-chapter consolidation and wording review. V1, V2, V3, V4, V6, V8
OI-PROP-ADP-015 Capability Traps Are Self-Reinforcing
Operational pressure can reduce improvement investment, weaken capability and create evidence that appears to justify further short-term pressure.
Source: P15 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E8 Organisational Capability; Adaptation; Provenance CL-18; CL-23 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-ADP-016 Path Dependence Narrows Adaptation
Prior investments, routines, metrics, identity and coordination can make obsolete capability difficult to replace even where evidence favours change.
Source: P16 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E8 Organisational Capability; Adaptation; Provenance; Coordination; Measurement CL-23 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-ADP-017 Capability Requires Maintenance
Capability will decay where knowledge, practice, technology, ownership and resources are not refreshed.
Source: P17 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E4; ADP-E8 Organisational Capability; Adaptation; Organisational Knowledge CL-18; CL-23 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V6, V8
OI-PROP-ADP-018 Automation Can Erode Capability
Technology may improve immediate performance while reducing human learning, internal understanding or recovery capacity.
Source: P18 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
A / Moderate–Low ADP-E10 Organisational Capability; Adaptation; Agent Execution Envelope; Recovery; Organisational Learning — RAI — Retain with explicit task, model, setting and time qualification. V1, V3, V4, V5, V6, V7, V8
OI-PROP-ADP-019 Capability Retirement Is a Core Adaptive Function
Organisational adaptation depends on the ability to retire obsolete routines, tools, authority and dependencies rather than only add new capability.
Source: P19 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E4; ADP-E11 Organisational Capability; Adaptation; Action Authority CL-23 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V7, V8
OI-PROP-ADP-020 Adaptation Is Not Change Volume
Organisational change contributes to Adapt only where it is evidence-linked and improves or preserves responsible future response capacity.
Source: P20 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
O / Moderate–Low ADP-E11 Organisational Capability; Adaptation; Provenance CL-20 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-ADP-021 Adaptation Must Remain Coherent
Local capability changes can reduce organisation-level intelligence where they damage shared purpose, dependencies, authority or identity.
Source: P21 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
O / Moderate–Low ADP-E2; ADP-E11 Organisational Capability; Adaptation; Purpose; Action Authority CL-20 ROI — Retain as a Project OI working proposition requiring explicit validation. V1, V2, V3, V4, V6, V7, V8
OI-PROP-ADP-022 Resilience and Adaptation Differ
Resilience preserves viable performance through disturbance, while adaptation changes the capability system for future conditions.
Source: P22 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
D / High ADP-E9 Organisational Capability; Adaptation; Resilience CL-17 RAD — Retain pending final adversarial and construct-boundary review. V1, V2, V4, V6, V8
OI-PROP-ADP-023 AI Can Distribute and Reconfigure Capability
AI may make expert-derived performance and cross-functional contribution more widely available under some task and organisational conditions.
Source: P23 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
A / Moderate–Low ADP-E10 Organisational Capability; Adaptation; Agent Execution Envelope CL-13 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-ADP-024 AI Can Create Borrowed Capability
Performance dependent on a model provider should not be represented as fully internal organisational capability where verification, portability or continuity are weak.
Source: P24 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
A / Moderate–Low ADP-E10; ADP-E11 Organisational Capability; Adaptation; Agent Execution Envelope CL-12; CL-14 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-ADP-025 AI Capability Requires Organisational Integration
Model access becomes organisational capability only where it is integrated with human roles, authority, workflow, evidence, outcome evaluation and lifecycle governance.
Source: P25 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
A / Moderate–Low ADP-E10; ADP-E11 Organisational Capability; Adaptation; Agent Execution Envelope; Provenance; Action Authority CL-13 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V4, V5, V6, V7, V8
OI-PROP-ADP-026 Capability Sovereignty Is Conditional
Organisations need not own every capability element but should retain sufficient control over critical purpose, authority, continuity, evidence and exit.
Source: P26 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
A / Moderate–Low ADP-E11 Organisational Capability; Adaptation; Purpose; Provenance; Action Authority CL-12; CL-14 RAI — Retain with explicit task, model, setting and time qualification. V1, V2, V3, V5, V6, V7, V8
OI-PROP-ADP-027 Adaptation Closes the OI Loop
Adaptation strengthens Organisational Intelligence where learning changes future capacity to sense, know, choose, mobilise and improve.
Source: P27 in Project-OI-BOK-009-Capability-Development-and-Adaptation-v0.3.md
O / Moderate–Low ADP-E11 Organisational Capability; Adaptation; Organisational Learning CL-01; CL-20 C10 — Consolidate into the Chapter 10 Connection Quality and loop-closure proposition; retain chapter source statement for traceability. V1, V2, V3, V4, V6, V7, V8

9. Consolidation Findings

9.1 The Register Contains Four Different Claim Types

The 182 propositions should not be treated as one homogeneous body of evidence. Directly anchored propositions, chapter synthesis, recent AI evidence and Project OI integrative extensions require different treatment in Chapter 10 and the adversarial review.

9.2 Connection and Transition Propositions Need One Integrated Form

Nine chapter-ending propositions state that the local capability must connect forward. They should remain in their source chapters but become one higher-order Chapter 10 proposition on Connection Quality and loop closure.

9.3 One Exact Duplicate Requires Merge

OI-PROP-EVL-003 and OI-PROP-LRN-007 are both titled Feedback Is Not Learning. The final proposition set should use OI-PROP-LRN-007 as semantic owner while preserving Chapter 7 as the transition and evidence source.

9.4 Transfer Propositions Need Scope Rather Than Collapse

Knowledge transfer, vicarious learning and capability transfer all require recontextualisation. They should remain distinct because the transferred object and receiving conditions differ.

9.5 AI Propositions Need Expiry-Aware Evidence

The 26 AI-era propositions should carry explicit metadata for:

  • task and domain;
  • model and version;
  • interface and tool conditions;
  • organisational setting;
  • human role and authority;
  • study design;
  • date and update trigger.

They should not be generalised from one field experiment, benchmark or provider implementation to “AI” as a stable class.

9.6 Direct Source Anchoring Does Not Remove Level-of-Analysis Risk

Several direct anchors originate in individual, team, technical-system or large-enterprise research. Chapter 10 must not infer an organisation-level OI capability without testing the aggregation and persistence mechanism.

9.7 The Final Proposition Set Should Be Smaller

The 182 chapter propositions are a traceability set, not the recommended final theory. OI-BOK-010 should select a parsimonious higher-order proposition set while preserving the full register as supporting evidence and diagnostic detail.


10. High-Priority Review Sets

10.1 Project OI Integrative Extensions

All O-class propositions require the strongest construct-boundary and field-testing discipline because they are the principal candidates for Project OI’s distinctive theoretical contribution.

10.2 Emerging AI-Era Propositions

All A-class propositions require temporal maintenance and should be reviewed before each BOK release for changed model capability, research evidence and governance conditions.

10.3 Working-Term Propositions

Propositions depending materially on glossary working terms such as attentional debt, context drift, shadow authority, handoff integrity, operational debt, borrowed capability, capability opacity and capability sovereignty require terminology validation before empirical operationalisation.

10.4 Normative Propositions

Propositions using “should”, “must”, “responsible” or equivalent normative language require explicit separation of:

  • empirical claim;
  • design recommendation;
  • ethical commitment;
  • and governance requirement.

11. Use in OI-BOK-010

OI-BOK-010 should use this register to produce a final proposition architecture organised around:

  1. attention and materiality;
  2. context and epistemic integrity;
  3. knowledge and expertise availability;
  4. decision, authority and legitimacy;
  5. coordination and mobilisation;
  6. execution and operational reliability;
  7. outcome, feedback and evaluation;
  8. memory, reflection and learning;
  9. capability development and adaptation;
  10. responsible human–AI participation;
  11. and connection quality across the complete cycle.

The final chapter should not simply reproduce every proposition. It should state which propositions are:

  • constitutive of the Project OI construct;
  • mechanisms;
  • enabling or conditioning factors;
  • outcomes;
  • risks or failure hypotheses;
  • normative governance commitments;
  • and future empirical hypotheses.

12. Next Consolidation Artefact

The next active artefact is:

OI-BOK-RELEASE-001 — Body of Knowledge Completion Record

It should consolidate the chapter-level failure modes, quality dimensions and candidate indicators while preserving semantic ownership and distinguishing:

  • capability failures;
  • transition failures;
  • epistemic failures;
  • authority and governance failures;
  • operational failures;
  • feedback and learning failures;
  • persistence and adaptation failures;
  • enabling conditions;
  • outcome measures;
  • and direct versus proxy evidence of Organisational Intelligence.

The blog, product-implication, implementation-pattern and architecture-reconciliation workstreams remain paused.


13. Editorial Guardrail

This register preserves propositions for traceability; it does not transform them into validated laws. Project OI should retain only the smallest coherent higher-order proposition set needed to explain Organisational Intelligence, while preserving local mechanisms, evidence limits, disagreement and future validation requirements in the supporting register.